Radom Airport is rated 3 out of 5 in the category airlines/aviation. Read and write reviews about Radom Airport. An important new destination on the Europe's aviation map. Radom Airport aims to welcome it's first passengers in 2013. Regional airport in Radom is being created by the transformation of the military base into a civilian airport. This year will start the construction of a temporary passenger terminal. It will be rady in May 2013. Airport parametres: Regional civil airport, code 3C (4D to be obtained). Area: 147.5 ha, thereof 22.5 ha civil area and 125 ha shared with the army. Runway dimensions: 2000 x 60 m Runway surface: tarmac in the central part, concrete at the ends (200 m and 230 m) Runway Safety Area dimensions: 2500 x 285 m Taxiway: tarmac, modernised in the year 2000 Runway and manouver routes are equipped with a drainage system. No buildings in the main landing direction. Navigation equipment: - military NDB 1150 m and 4000 m from runway threshold - military navigation lightning system at the main landing approach - taxiway edge lights every 100 m - altitude and surveillance radar Temporary terminal: Usable area: 3000 sq m Capacity: 550 thousand passengers a year. Facilities: passenger and baggage check-in stations, restaurants, bars, 2-3 duty-free shops, car rental, chappel, tour operators stations, customer service points and offices.
Address
ul. Żeromskiego 86
Company size
11-50 employees